Kalindee's prestigious awarded projects running across India are as follows:

Total Value Projects Awarded Date
109.85 Crores INR

Gauge Conversion of Metre Gauge Single Line to Broad Gauge Railway Line of Villupuram to Mayiladuturai Section (121.78 KMS.) including Electrical Works (OHE & General) Supply and Replacement of Existing Signalling System on Southern Railway awarded by Rail Vikas Nigam Ltd, Delhi.
Gauge Conversion of VilluPuram - Mayiladuthurai Section - Proposed improvments of LC's, Earthwork in filling for Platforms and bridge backfilling, Painting of PSC girders, Pairing of goods Platforms and other works between Cuddalore Port Junction and Parangipettai.

17/04/2006
108.45 Crores INR Installation and Commissioning of Track Work (31.30 kms) of Phase-II-Part I Corridor, Yamuna Depot and Workshop of Delhi Metro. 06/06/2007
102.70 Crores INR Installation of Signalling for Doubling of Railway Line between Gooty-Pullampet section (151.05 kms) in the state of Andhra Pradesh, in South Central Railway, awarded by Rail Vikas Nigam Ltd., Delhi. 30/06/2006
99.98 Crores INR Installation and Commissioning of Track work for Delhi Metro Airport Express Line (22.95 kms: both elevated and underground). 27/11/2008
82.80 Crores INR Construction and Commissioning of new Rail Track, Signalling & Over Head Power Supply Works for Palwal- Bhuteswar 3rd Line (81 KMS.) on North Central Railway awarded by Rail Vikas Nigam Ltd., Delhi. 20/03/2007
33.24 Crores INR Installation and Commissioning of Railway Siding at APCPL plant (IGSTPP) at Jhajjar, Haryana 02/06/2009
27.26 Crores INR AFC DM for Design, Manufacture, Supply, Installing, Testing and Commissioning of Automatic Fare collection system for Banglore Metro Rail Corporation Ltd. 27/07/2009
22.99 Crores INR Offshore Design, Manufacture and Supply of AFC Equipment and Spare for 41 Stations of Phase II including Central System for Phase II (BS 22A) and Local Supplies, Installation, Testing and Commissioning of AFC System  for 19 Stations including Central System for Phase II (BS 22B) and Option (CCHS) for Automatic Fare Collection  (AFC) System for Phase II of Delhi Metro. 12/02/2008
13.77 Crores INR Installation and Commissioning of Signalling and Telecommunication facilities at NTPC, Kahalgaon for their Thermal Power project. 23/04/2009
12.64 Crores INR Installation and Commissioning of Signalling system at Kota and Bhopal Division of West Central Railway. 28/03/2009